Dietmar Feichtinger Architectes . Buzzo Spinelli Architecture . photos: © DFA David Boureau . © Ariavista Julien Angella
In Bastia, Corsica’s second largest city on the north-east coast, Dietmar Feichtinger Architectes achieved the promenade Aldilonda, which means “Above the Sea” in Corsican with local architects Buzzo Spinelli, Insitu landscape and the engineers of Sbp.
The path becomes the destination
Anchored in the rock, Aldilonda follows the cliffy coastline five meters above sea level. The rock forms the massive natural foundation of the mighty enclosing wall of Bastia’s fortress, which gave the city its name. Until now, the coastline under the fortress wall was only partially accessible.
More than a path, a destination with new perspectives on the open sea, suspended between sea and sky, Aldilonda becomes a spectacular event.
The softly curved path contrasts the massive fortress and the rock on which the bastion is founded. The path nestles against the rock, leans against it, and breaks through it. Sensitively, the construction blends into the rocks, the rich natural space of the coast is carefully traversed.
The path widens out and offers places to rest. The sea can be experienced through the area covered with a transparent grid. The balcony is exposed to the rough surf; when the waves are high, the water penetrates the stainless-steel grid on the rock, thus reducing the massive force of the water.
Hydraulic tests in a basin in La-Seyne-sur-Mer were necessary to determine the force of the wave impact at 14 tons per square meter. Special care was also taken to ensure the durability of the materials. For example, the reinforcement density in the areas most exposed is around 400 kg/m³.
The acrobatic use of workers, suspended from the platform of the fort on the trapeze, made it possible to anchor the construction in the rock. Drilling jigs had to be designed to anchor the 25-metre-long tension bars.
The southern point of the fortress remains untouched
To keep the toe of the fortification wall, which stretches furthest into the sea, clear, the path at the south end pierces the rock in the form of a gallery, a tunnel. It connects the walkway above the sea with the “Spacimare” promenade by a gently sloping path at the exit of the tunnel. A vertical light well provides natural light to the passage. A staircase leads up to the elevated plateau of the fortress.
The side walls and the ceiling are made of fair-faced concrete. The wood grain of the shuttering is reflected on the surface. The lighting is embedded in the ceiling.
One access for all
To the north, the path connects to a staircase that provides direct access to the old harbor. At the same time, a gently sloping ramp accompanies the quay wall “Jetée du Dragon” and closes off the promenade accessible to all, elderly people, people in wheelchairs and parents with children in prams, as well as cyclists and rollerblades.
The red ribbon
The safety is formed by narrowing uprights with a spacing of 110mm. These are made of solid Corten steel. The iron-rich rock harmonizes strongly with the rust red of the railing. An L-shaped profile, also made of Corten, closes off the concrete on the outside of the path. The individual uprights are welded to the L-profile and follow the undulation of the path. Frontally they offer maximum transparency. From the side, they form a band that provides a sense of safety.
The discreet lighting
At intervals of three meters, LED strips are integrated into the uprights as lighting. They discreetly illuminate the path and the rock in the lower area of the walkway.
_
Address:Citadelle de Bastia
Client:Mairie de Bastia Avenue Pierre Giudicelli, 20412 Bastia, Corse
Architect mandatory:Dietmar Feichtinger Architectes
Architect Dipl.-Ing. Dietmar Feichtinger
80, rue Edouard Vaillant 93100 Montreuil
+33 (0)1 43 71 15 22
Team DFA:Dietmar Feichtinger, Jan Feichtinger, Miguel Piedras Lobo, Arthur Royer
Local partner architect:Buzzo Spinelli Architecture
Immeuble Giovasole, Port de Plaisance
20169 Bonifacio
Landscape planning:IN SITU paysage et urbanisme
8 quai Saint Vincent
69001 Lyon
Engineers:SBP BET structure
3 rue d’Alexandrie
75008 Paris
Roads and Utilities:BETEM PACA, BET pluridisciplinaire VRD, études environnementales et réglementaires (EI, DLE, …)
900 rue André Ampère
13290 Aix-en-Provence
Hydrodynamic studies:GENIE COTIER : OCEANIDE
Port de Brégaillon – BP 63 83502 La Seyne sur Mer
Sous-traitant : Techniques de constructions maritimes, calculs hydrodynamiques, simulations numériques et physiques, dimensionnement des ouvrages du génie côtier
Size and main features
Total length:450 m
Large:3m for the path en concret, variations according to deepness of the rocks
Weight:Eléments préfabriqués en béton, fixés sur les consoles en béton ancrées dans le rocher, et dalles en béton préfabriquées posées sur le rocher
Excavation on site:
Enrochements à déplacer : 800 t
Terrassement en déblais remblais : 500 m³
Deblais de toutes natures à évacuer : 250 m³
Elements of tension:
Ancrages dans le rocher sain, 3m de profondeur
Diamètre de 51 mm
High above sea level:5m
Time Schedule:
Competition:Competition entry 04 | 07 | 2017
Start of planning:10 | 2017
Start of construction:Groundbreaking 02 | 2019
Completion:Inauguration 23 |12 | 2020
Building costs :L’Aldilonda: 9 750 000 €
Travaux complementaires: 309 000,00 €