Entrada retirada a petición de los arquitectos.
Post removed as requested by the architects.
OFFICE Kersten Geers David Van Severen . Jaspers-Eyers Architects
Building permit granted for the ambitious office building which aims to give new light to the European Quarter in Brussels. Designed by OFFICE Kersten Geers David Van Severen in collaboration with Jaspers-Eyers Architects and developed for Immobel, resolves the complex condition of the corner of a city block by means of three volumes of varying sizes. Each volume has its own architectural expression and character while all being finished in stainless steel. The stepping configuration of these volumes make spaces for roof gardens on two levels. The lower volume offers communal spaces within the building. Its double height floors allows passersby an extended view through the building and into the garden in the back.