The gymnasium and event hall in Ingerkingen was built in the 1960s and has since been expanded and remodeled several times.
To meet the requirements of a contemporary single-field hall, the building was reduced and enlarged in the southern and eastern areas. To minimize demolition, the foundations, floor slab, ceilings, and the solid walls in the northern part, as well as the street-side stage section, were integrated into the planning. This allowed for the preservation of a total of 60 percent of the building mass. This was only possible through the development of an innovative structural system. A single-hinged two-joint frame made of glued laminated timber is aligned with the existing reinforced concrete columns and, due to its geometry, only transfers a portion of the loads to the existing structure.
_
Die Turn- und Festhalle in Ingerkingen wurde in den 1960er Jahren erbaut und später mehrmals erweitert und umgebaut. Um den Anforderungen an eine zeitgenössische Einfeldhalle zu genügen wurde die Halle im südlichen und östlichen Bereich zurückgebaut und vergrößert. Um den Abriss auf ein Minimum zu reduzieren, wurden Fundamente und Bodenplatte, Decken und die massiven Wände im nördlichen Teil und der straßenseitige Bühnentrakt in die Planung integriert. So konnten insgesamt 60 Prozent der Baumasse erhalten werden. Dies konnte nur durch die Entwicklung eines innovativen Tragwerks realisiert werden. Ein einhüftiger Zweigelenkrahmen aus Brettschichtholz ist auf dem Achsraster der bestehenden Stahlbetonstützen ausgerichtet und leitet aufgrund seiner Geometrie lediglich einen Teil der Lasten in den Bestand ein.