bosch.capdeferro . 6X6 BLOCK . Girona afasia José Hevia (2)

bosch.capdeferro arquitectura . photos: © José Hevia

Located in a transition zone between the denser grid of the city and open areas of new expansion hosting a large number of public facilities, the project proposes the design of a 35 apartment block based on program flexibility criteria and seeking an important reduction of the carbon footprint throughout the life cycle of the building.

The use of cross-laminated timber panels (CLT) for the construction of the volume above ground raises a bearing wall building typology and defines similar domestic spaces between structural elements. The units are composed of six similar and reconfigurable rooms of about 12 m2 ready to host multiple uses, suggesting a free appropriation of each space and incorporating possible changes over time according to the shifting needs of the inhabitant, as well as to house possible spaces for community use (nursery, gym, workplaces, collective kitchen-dining room …).

In addition to reducing the energy embedded in the construction process, the project makes a significant effort to reduce the energy demand to guarantee the thermal comfort of the living spaces, combining good insulation and cross ventilation with the maximum use of sun radiation. A gallery conceived as an inhabitable greenhouse on the south façade allows passive preheating of the ventilation system’s inlet air during winter, while in summertime the circuit is reversed and the gallery is reconfigured as a shaded space in contact with the environment.
_

BLOQUE 6X6
Girona
bosch.capdeferro arquitectura
nom
bloc 6×6 / bloque 6×6 / 6×6 block

autors
bosch.capdeferro arquitectura
Elisabet Capdeferro i Pla
Ramon Bosch i Pagès

data
2017-2020

superfície construïda
4.375,50 m2

emplaçament
Carrer Tomàs Carreras i Artau, 6
17006 Girona, Espanya

promotor
Privat

constructor
Egoin / Alumilux / Jaume Fusters / Placoguix / Elèctrica Riam / EIS Girona / Estructuras Ultra / Telecta.
Eddie Chalecki, col·laboració gestió d’obra.

col·laboradors
Raül Elias Bramon (cap de projecte)
Arnau Arboix Sala (arquitecte)

Arquitecte tècnic: Xavier de Bolòs
Enginyeria: L3J arquitectura i enginyeria. Jaume Pastor
Consultoria sostenibilitat: Societat Orgànica + 10, s.c.c.l. Luca Volpi.
Estructura: Arquitectes consultors d’estructures Blázquez Guanter s.l.p. Lluís Guanter.
Consultoria acústica: SiS consultoria acústica s.l. Francesc Sampedro.
Control de qualitat i assessorament: Incafust, Institut Català de la Fusta. Eduard Correal.
Serveis Tècnics d’Egoin Beñat Serna

fotografies
José Hevia

 

Situado en un entorno urbano de transición entre la ciudad compacta y el ensanche en manzana abierta caracterizado por una importante presencia de equipamientos públicos, el proyecto propone el diseño de 35 viviendas a partir de criterios de flexibilidad de programa y reducción de la huella de carbono a lo largo del ciclo de vida del edificio.

El uso de paneles de madera contralaminada (CLT) para la construcción del volumen sobre rasante plantea una tipología de estructura muraria y define unos espacios habitables similares entre elementos portantes. Las viviendas están compuestas por seis estancias de unos 12 m2 capaces de albergar múltiples usos que permiten ser conectadas a voluntad, sugiriendo una apropiación libre de cada espacio e incorporando posibles cambios en el programa a lo largo del tiempo según las voluntades o necesidades del habitante, así como alojar posibles espacios de uso comunitario (guardería, gimnasio, locales de trabajo, cocina-comedor colectivos...).
Además de la reducción de la energía embebida en la construcción, el proyecto realiza un importante esfuerzo en la reducción de la demanda energética necesaria para garantizar el confort de los espacios habitables, combinando un buen aislamiento y la ventilación cruzada con el máximo aprovechamiento de la radiación solar. La situación de una galería como invernadero habitable en la fachada sur permite el precalentamiento pasivo del aire de aportación del sistema de ventilación en invierno, mientras que en período estival se invierte el sentido del circuito y la galería se reconfigura a modo de umbráculo en contacto con el medio.