0

Westner Schührer Zöhrer

2semesters 150entradas 150posts 2semestres

 

Vereinsgebäude Olympiapark . Munich

Westner Schührer Zöhrer  . Vereinsgebäude Olympiapark . Munich afasia (3)

Westner Schührer Zöhrer Architekten und Stadtplaner . photos: © Sebastian Schels (building) . © Burko Jaeger (model) . Drawings: © Westner Schührer Zöhrer

 

The clubhouse on Moosacher Strasse is located at the northern end of the Olympic Park. The needs of the sports club and an adjacent urban development are the necessity to reinterpret the situation. The building is constructed with a modular wooden structure. Due to the structure of the building, existing movements of the street and sport fields are rhythmized and incorporated into the landscape. There is an aesthetic moment of the serial: Repeat, practice, and train to be prepared for the next game.
_

Vereinsgebäude Olympiapark
Munich, 2018
Architect: WESTNER SCHÜHRER ZÖHRER
Architekten und Stadtplaner PartGmbB
Location: Moosacher Straße 99, Munich
Completion: 06/2017 – 12/2019
public Client: City of Munich, represented by the construction department
Service phases: 1-9
Gross volume: 2,650 cbm
Gross floor area: 667 sqm
Usable area: 354 sqm
Costs (200-700): € 5.68 million (gross)
Photography: Sebastian Schels (building)
Burko Jaeger (modell)
Drawings: Westner Schührer Zöhrer Architekten und Stadtplaner